Project
192 sf
16' x 12' deck
Pieces
182
17 distinct cuts
Lumber
885 bf
1,035 LF net
Offcut waste
9.6%
after packing into stock
Budgetary range
$7,700 – $13,000USD
$40–$68 / sf
Building kit$3,300 – $4,700
Foundation$300 – $500
Erection labor$4,100 – $7,800

Budget only, not a quote. Planning rates, Oct 2026: regional material and labor factors and fixed exchange rates. Excludes land, site work, permits, engineering, utility connections, interior finishes and taxes.

  • joist span 9.9 ft is within the ~15.0 ft limit for 2x10 at 16" o.c.
  • Ledger must be flashed and lag/through-bolted to the rim board, not just nailed.
  • Stairs: 5 risers at 7.20" with 10.5" runs — keep every riser within 3/8" of the others on each flight.
Material takeoff
Cuts packed into yard stock lengths
CategoryItemQtyUnitBoard ftNotes
Lumber1x8 pressure-treated × 16′1boards115 cuts packed from this size
2x10 pressure-treated × 16′17boards45317 cuts packed from this size
2x12 pressure-treated × 12′2boards484 cuts packed from this size
2x2 pressure-treated × 16′15boards8088 cuts packed from this size
2x4 pressure-treated × 12′8boards6420 cuts packed from this size
4x4 pressure-treated × 14′4boards7512 cuts packed from this size
5/4x6 pressure-treated × 16′27boards27033 cuts packed from this size
6x6 pressure-treated × 8′1boards243 cuts packed from this size
Footings12" dia x 42" pier3eapoured, concrete in hardware
Stair landing pad, 4" slab1eapoured, concrete in hardware
HardwareJoist hanger (galvanized)22ea
1/2" x 4" ledger lag screw + washer24ea
Adjustable post base3ea
Post-to-beam cap3ea
1/2" structural through-bolt6ea
Concrete mix (60 lb)11bag
Deck screws (2-1/2", 5 lb box)2box
Ledger flashing (10 ft)2ea
Stair stringer hanger4ea
Railing post bolt kit12kit
Post cap (4x4)12ea

Material package from common framing practice and a demo price book. Spans, footings, frost depth and setbacks are guidance only: confirm with your local building department before you build.