Pricing
Loading 3D viewer…
Steel
4.87 t
9,734 lb
Linear feet
10,545
860 members
Trusses
39
24″ o.c., in-line
Sheathing
232
113 wall · 119 roof
Budgetary range
$111,000 – $180,000USD
$35–$56 / sf
Building kit$33,500 – $50,700
Doors & windows$7,000 – $12,000
Foundation$22,400 – $35,200
Erection labor$47,800 – $81,900

Budget only, not a quote. Planning rates, Oct 2026: regional material and labor factors and fixed exchange rates. Excludes land, site work, permits, engineering, utility connections, interior finishes and taxes.

Material takeoff
Counted from the framed model
CategoryItemQtyUnitLFlbNotes
Wall framingStud — 362S162-33105pcs1,5761,460cut to length, longest 20′-10 1/16″
King stud — 362S162-3316pcs234216cut to length, longest 18′-9 15/16″
Jack stud — 362S162-3318pcs146135cut to length, longest 11′-11 15/16″
Cripple stud — 362S162-3319pcs10698cut to length, longest 8′-0⅛″
Track — 362T125-332820′ lengths55040124 runs, +7% waste
HeadersBox header — 600S162-4314pcs5891cut to length, longest 4′-3¼″
Box header — 1000S162-432pcs2555cut to length, longest 12′-6½″
BracingX-strap — 4in flat strap-541420′ lengths28021516 runs, +7% waste
Roof trussesTruss chord — 362S162-43117pcs3,2853,967cut to length, longest 40′-0″
Truss web — 250S162-33507pcs2,5802,049cut to length, longest 7′-3 3/16″
RoofHat channel — 150F125-33 hat9520′ lengths1,8831,16322 runs, +7% waste
SheathingWall sheathing ½″ exterior, 4×8113sheets3,371 sf net of openings
Roof sheathing ⅝″, 4×8119sheets3,542 sf incl. 1′ eaves
Cladding29 ga ribbed roof panel — Charcoal58pcscut 22′-3⅝″
29 ga ribbed wall panel, sidewalls — Ash Gray58pcscut 14′-1″
29 ga ribbed wall panel, endwalls — Ash Gray30pcscut to rake, 489 LF total
Ridge cap — Charcoal910′6″ sticks8680 LF
Eave trim — Charcoal1810′6″ sticks171160 LF
Rake trim — Charcoal1010′6″ sticks9589 LF
Outside corner trim — Charcoal610′6″ sticks6056 LF
Base trim — Charcoal2610′6″ sticks257240 LF
Opening trim — Charcoal1610′6″ sticks159149 LF
#12 × 1¼″ self-drill panel screw, color-matched5,196pcsroof 80 / wall 60 per 100 sf
Fasteners#10-16 × ¾″ hex washer head, self-drill8,860pcsstud-to-track, headers, truss webs, purlins, straps
#8 × 1¼″ bugle head, self-drill9,930pcs6″ edge / 12″ field
ConnectionsHold-down, strap bay ends16pcs8 braced bays
½″ wedge anchor, bottom track @ 48″ o.c.64pcsplus one each side of every door
Truss heel clip78pcs39 trusses @ 24″ o.c., in-line with studs